The challenge
Coordinating a 26,479m² multi-level commercial complex across a 5-hectare lakeside site, requiring deep basement retention, rapid composite floor slab construction, and seamless interdisciplinary collaboration with international partners L&S Consulting (Pty) Ltd.
Our approach
Pad Foundations with Tie Beams, 350mm Basement Retaining Walls, 60mm Precast Panel Slabs with 90mm RC Topping & Structural Steel Roof Trusses
The design opportunity
Delivered pad foundations with tie beams, 350mm thick basement retaining walls, typical 60mm precast panel slabs with 90mm reinforced concrete topping, and structural steel roof trusses with aluminum sheeting, complemented by comprehensive civil works including walkways, pavements, drains, manholes, and associated services infrastructure.